06.08.2014

The pitch reconstruction is finished at Olymp-2

print version

At FC Rostov home stadium the pitch reconstruction is finished. Within its frames the following activities took place: watering, drainage and heating systems were replaced. The contractor dealing with this work several years ago installed a new pitch at Akhmat Arena in Grozny, which is considered one of the best stadiums in Russia, as the website of the club informs.

A big amount of work has been done within the shortest period, as Head of Sports Facilities Operation Robert Chenibalayan informed. Modern horizontal drainage was used  at the new pitch. Before the water collectors were around the pitch perimeter and now – on the east side.

Fertile soil layer on the pitch was reduced  a little bit – till 50 mm. It reduces the possibility of the pitch compressing, the pitch will be flooded less. Special computer system regulates watering system. It is possible to set time and area for watering, make focus on the central circle, front or touchlines. 


Media:


Latest News:

news

09.10.2024

Viktor Gancharenko signs with Pari NN

The coach joined Nizhny Novgorod club on two-year contract

news

07.10.2024

Orenburg announce Vladimir Sliskovic appointment

Coach spent two seasons with Spartak as assistant coach and interim manager

Обратная связь

Вы можете обратиться в РФПЛ с интересующим Вас вопросом или оставить сообщение (пожелание, замечание). Также вы можете сообщить имеющиеся у вас сведения о "договорных" матчах.

Отправить

Обратная связь

Вы можете обратиться в компанию Sportradar с интересующим Вас вопросом или оставить сообщение (пожелание, замечание).

Отправить